FINAL APPLICATION FOR LICENSE


Borel Hydroelectric Project
(FERC Project No. 382)

Final Application for License for
Major Project – Existing Dam

February 2003

Cover Letter

Confidential Materials Statement

Volume 1 of 6

Cover

Initial Statement and Table of Contents

Sec. 4.32. General Information

Exhibit A. Description of Project

Exhibit B. Statement of Operation and Resource Utilization

Exhibit C. Construction History and Proposed Construction Schedule

Exhibit D. Project Costs and Financing

Exhibit E. Environmental Report (This exhibit can be found in Volume 2 of this Application.)

Exhibit F. Design Drawings and Supporting Design Report

Exhibit G. Project Maps

Exhibit H(a). General Information

Exhibit H(b). General Information

Appendices

List of Appendices

D-1. 30 Year Return on Rate Base

D-2. 30 Year Total & Annual Value

H(a)-1. Project Generation

H(a)-2 Single-Line Diagrams

Antelope-Bailey 66 kV System
Vestal 66 kV System

Volume 2 of 6

Cover

Table of Contents

Exhibit E. Environmental Report

0.0. Executive Summary

1.0. Introduction

2.0. General Description of the Locale

3.0. Report on Water Use and Quality

4.0. Report on Fisheries, Wildlife and Botanical Resources

5.0. Report on Historic and Archaeological Resources

6.0. Report on Recreational Resources

7.0. Report on Land Use and Aesthetics

8.0. Report on Comprehensive Plans and Cumulative Impacts

9.0. Consultation Documentation

10.0. Additional Information

11.0. References and Literature Cited

Volume 3 of 6

Cover

Table of Contents

Exhibit E Appendices

A. Kern River Basic Hydrology Information

B. Indicators of Hydrologic Alteration Analysis Results

C. Historic Water Quality Data for the Kern River in the Borel Project Area and Lake Isabella

D. Technical Report on the Limnology of Lake Isabella

E. Technical Report on California Stream Bioassessment (Benthic Macroinvertebrates) of the Kern River near SCE’s Borel Project

F. Equations for Determining Numerical Basin Plan Objectives for Ammonia, Copper, Lead and Zinc

G. Project Area Map of NPS Pollution Sites

H. Stiff Diagrams (Electronic Version Not Available)

I. Worksheets (Electronic Version Not Available)

J. Hazardous Waste Guidance Manual (Electronic Version Not Available)

K. Spill Prevention Control and Countermeasure Plan (Electronic Version Not Available)

Volume 4 of 6

Cover

Table of Contents

Exhibit E Appendices

L. Site Emergency Plan (Electronic Version Not Available)

M. Technical Report on Fish Population Monitoring, Lower Kern River, Kern County, California, April 2001

N. Creel Census/Angler Survey Results

O. Technical Report on Fish Entrainment into the Borel Canal

P. Riparian Analysis for the Borel Project

Q. Borel Project Roads and Trails

R. Bureau of Land Management Whitewater Boating Objectives Study

S. Recreation Use and Suitability Study

T. Recreation Technical Report

U. Summary of Kern River Fisheries Studies

V. Boating Flow Augmentation in the Borel Project Diverted Reach of the Kern River

W. Forest Service Manifest Database and Corresponding Flow Information

X. Wildlife Study Plans (Electronic Version Not Available)

Y. Proposal for Low Water Launch Improvement (Electronic Version Not Available)

Figure
(USE YOUR BROWSER BACK BUTTON TO RETURN TO THIS PAGE)

Augmentation Flow Model (Warning: This is a large Excel file)

Volume 5 of 6 (Electronic Version Not Available)

Cover

Table of Contents

Consultation Documentation: Letters and Telephone

E-mail Records

Press Releases

Meetings

First Stage Consultation Package Comment Letters

Volume 6 of 6 (Electronic Version Not Available)

6a. Confidential Cultural Resources Management Plan

6b. Critical Energy Infrastructure Information

6c. Non-Internet Public information

 


Copyright © 2003 MWH, All Rights Reserved
Last modified: March 5, 2003